Solar Window Films

Solar control film is the cheapest energy retrofit in the building — no new glass, no construction, no scaffolding, and it's reported under the city's benchmarking ordinance.

A neighbourhood storefront filmed to cut glare while keeping the display visible.

Solar Control Films

The Retrofit
That Pays For Itself

Replacing curtain wall or single-pane glazing with high-performance units is a construction project with a construction budget and a schedule measured in quarters. Solar film delivers a large share of the same performance for a fraction of the cost, installed from the interior, overnight, with no permits and no scaffolding.

For Downtown owners there's a compliance dimension too. Los Angeles requires large buildings to benchmark and disclose energy and water performance, which turns cooling load from an operating annoyance into a reported number. Envelope improvements that can be executed in weeks rather than years are disproportionately valuable when a disclosure date is fixed.

  • Up to 80% infrared heat rejection
  • 99% UV blocked
  • Spectrally selective, ceramic and reflective options
  • Solar heat gain coefficient modeling
  • Title 24 and benchmarking documentation
  • Utility rebate paperwork support
Free Quote

What Sets Us Apart

Why Businesses Choose
Window Films of Los Angeles

Targeted Rejection

Spectrally selective products take out the infrared and leave the daylight a tower floor plate depends on.

Fast Payback

A long cooling season and high commercial rates put typical payback inside a few years on most elevations.

Weeks, Not Quarters

Glazing replacement is a multi-quarter project. Film on a full elevation is a matter of nights.

Documented Performance

Published SHGC, VLT, and IR rejection figures you can hand to an energy consultant or file for benchmarking.

Our Process

How It Works

01

Energy Assessment

We record the glass, its aspect, and how it performs today, then name the elevation that repays treatment first.

02

Model The Options

Two or three products compared honestly on performance, daylight, exterior appearance, and cost.

03

Install

Applied from inside the envelope — no swing stage, no permit, no interruption to the building's operation.

04

Verify & Document

Post-install walkthrough, performance documentation, and support for rebate, Title 24, or benchmarking filings.

Ready When You Are

Get Your Free Quote Today

Every assessment is free, itemized by opening, and comes with honest advice about which glass actually needs treating. On most buildings that's one or two elevations, not the whole envelope.

Put the details in the form and we'll respond inside one working day.

Get Your Free Quote

Every quote is free and no-obligation. Tell us about your glass and we'll get back to you within one business day.

Get a Free Quote